First article inspection (FAI)
Proving that the first part made by a new process, tool or supplier matches the drawing, before full production starts. It is usually a condition of the contract.
3D scanning (structured light, or 3DSL)
Measuring the whole shape of a part without touching it, using a camera and a pattern of light projected onto the surface. It captures millions of points, so you can see the shape of an error, not just a single dimension.
CMM (coordinate measuring machine)
A machine that measures a part by touching it at precise points with a probe. Very accurate on the features it touches, but slower than scanning and limited to the points you choose.
Qualification
Proving that a part, process or supplier reliably produces what the drawing and the contract demand.
Sentencing
Deciding whether a measured part passes, fails or needs an engineer to review it. In repair, deciding whether a used part goes back into service, is repaired, or is scrapped. An engineer always makes that decision.
Gauge R&R and measurement system analysis (MSA)
Tests that show whether a measurement can be trusted: do you get the same answer twice, and does everyone who measures get the same answer? If not, the data behind your decisions is unreliable.
Tolerance
The amount a dimension is allowed to differ from the drawing and still be acceptable.
Digital twin
A digital record of a part or a process that builds up as work is done. It lets you compare one part with hundreds of others and spot what makes a good one good.
Traceability
Being able to show, for any part, what was measured, when, by whom, with which equipment, and what was decided. Auditors ask for this and gaps in it cause failures.
MRO (maintenance, repair and overhaul)
The business of servicing parts and engines after they have been in service, rather than making new ones.
OEM (original equipment manufacturer)
The company whose name is on the finished product, for example an engine maker. Their requirements flow down to every supplier.
NADCAP
An aerospace industry accreditation for special processes, awarded after an audit of how the work is actually done. Ours covers 3D scanning.
AS9100
The aerospace quality management standard. It governs how a company runs its quality system, not a single process.
Ceramic core
The ceramic insert used when casting a turbine blade, which forms the cooling passages inside it. Measuring cores is difficult and matters enormously to how the finished blade performs.
MiDAS
Our software. It records each measurement against the part it came from, checks it against your acceptance rules, and produces the report, with no retyping. Sold in three parts: the core record-keeping, an add-on that plans work and makes routine pass-or-fail decisions automatically, and an add-on for companies running several sites.
ATLASQual
The part of MiDAS that plans the inspection work: what needs measuring, in what order, and by when. In our quality workflows it also sends each exception to the right person and records their sign-off.
MiDASMIND
The rules engine inside MiDAS. It applies your own acceptance rules to each measurement, or checks a document against its requirement, and sorts it into pass, fail or refer to an engineer, so routine cases are clear at once. A person signs off.
PMI (product manufacturing information)
Tolerances and notes held inside the 3D CAD model rather than on a separate drawing. It lets inspection programs be built straight from the model.
Concession
Written permission, from your customer or whoever owns the design, to use or ship a part that does not fully meet the drawing or specification.
Non-conformance report (NCR)
The record raised when a part, a process or a document does not meet its requirement. It says what was wrong and what happens next.
Disposition
The decision on what happens to a part that does not conform: for example use as is, rework, or scrap. A named person signs it.
The 3Cs (corrective action)
Our name for the three parts of a corrective action: Concern (what went wrong), Containment (stopping it reaching other parts) and Countermeasure (stopping it happening again).
CAPA (corrective and preventive action)
A common quality process for fixing a problem and stopping it coming back: find the cause, correct it, then prevent it happening again elsewhere. We track corrective actions in whichever method your quality system uses.
8D (eight disciplines)
A structured, eight-step method for solving a problem as a team, from describing it and containing it to finding the root cause, fixing it and stopping it recurring. Widely used by aerospace and automotive customers.
Pareto chart
A bar chart that ranks causes from the biggest to the smallest, so you can see which few causes drive most of the problem, or most of the cost.
Certificate of Conformity (CofC)
A supplier’s signed statement that what it delivered meets the order: the right specification, revision and material.
Works order and route card
The paperwork that travels with a job through the factory, listing each operation and who did it.
Calibration certificate
The record that comes back with an instrument after calibration, showing how it measured against a known reference.
Drawing revision (issue)
Each version of a drawing or specification carries an issue letter or number. When issue A is replaced by issue B, the changes have to be found and followed.
AS9102
The aerospace standard for first article inspection records: the forms to fill in, and what each must show, so a customer can see that every feature on the drawing was checked.
Ballooned drawing
A copy of the drawing with a numbered balloon beside every feature and note, so each one can be measured, recorded and traced in the first article pack.
Back-test
Running a new check over records you have already closed, to see what it would have caught and how long the checking took.
FPI (fluorescent penetrant inspection)
A dye is applied to the part and drawn into any surface crack, which then glows under ultraviolet light.
Wall thickness measurement
Measuring how much material is left in a thin wall, usually with ultrasound, without cutting the part.
ERP (enterprise resource planning)
The business system that holds your orders, stock and jobs.
Air-gapped
Running on computers with no connection to the internet at all.